Project Administration · Agent blueprint · validated with 7 team members

Subconsultant Invoice Voucher Prep Agent

Watches the shared mailbox for subconsultant invoices, reads the PDF, checks it against the subcontract, and prepares the Vantagepoint voucher for the coordinator to approve in one step. After approval it saves the voucher, sets the approval route and drafts the notice to approvers.

56readiness · Standardize first
6–14 hback per week, of 32 h now
$14K–36Ka year
3–5 wkto build · size M

Build this after the team follows one procedure (see the training guide). Today too many cases take different paths for an agent to follow reliably.

Trigger

A subconsultant invoice email with a PDF attachment arrives in the shared Outlook mailbox (mostly in the first week of the month).

Done when: The voucher is entered in Vantagepoint and approved by the project manager (and the principal where the invoice is over $50,000), so it is ready to pay and to bill the client.

Needs: Invoice email and PDF (subconsultant name, invoice number, amount, project, dates, hours); Subcontract agreement on SharePoint (assigned phase, not-to-exceed amount); Vantagepoint vendor, project, phase status and vouchers already entered against the subcontract; Expense backup, where the invoice includes expenses; Approval rule: PM always; principal also if over $50,000

What the agent does

  1. 1
    Detect new invoice email and save the PDF attachment · Outlookconnector
    Trigger on the shared mailbox. Ignore emails with no PDF and pass them to the coordinator.
  2. 2
    Extract vendor, invoice number, amount, project, dates and hours from the PDF · Adobe Acrobatai
    The model reads the PDF file. Scans or odd layouts get a low-confidence flag. Acrobat is not opened; the file is read directly.
  3. 3
    Match vendor and project to Vantagepoint records · Deltek Vantagepointapi
    Look up the subconsultant and project. If there is no clear match, route to the coordinator as an exception.
  4. 4
    Find the subcontract and read phase and not-to-exceed amount · SharePointconnector
    Replaces the Edge detour seen in about 38% of cases.
  5. 5
    Compute remaining authorization from the subcontract and prior vouchers · Deltek Vantagepointapi
    Compare the invoice amount with what remains. If it exceeds the remainder, stop and flag it.
  6. 6
    Check that the phase is open and that expense backup is attached · Deltek Vantagepointapi
    Closed phase or missing expense backup becomes an exception for the coordinator.
  7. 7
    Set phase from the subcontract and approval route from the invoice amount · Deltek Vantagepointai
    Phase from the subcontract. Route is PM only, or PM plus principal when the amount is over $50,000.
  8. 8
    Show the coordinator the prepared voucher beside the invoice for approval · Outlookperson
    Adaptive card or Teams/Outlook approval with extracted values, phase source, authorization check and flags. Coordinator can edit or reject.
  9. 9
    Save the voucher with the approval route · Deltek Vantagepointapi
    Runs only after the coordinator approves. Records changes made by the coordinator.
  10. 10
    Draft the approver notice with voucher details and invoice link · Outlookai
    Addressed to the PM, plus the principal when over $50,000. It is sent only on the coordinator's approval.
  11. 11
    Send the approver notice · Outlookconnector
    Sent after the coordinator's sign-off (the same approval or a second click). Not sent unattended.

Decisions the agent makes

DecideRuleSource
VendorChoose the subconsultant named on the invoice PDF.The team
PhaseUse the phase the subcontract assigns to that subconsultant (each sub works under one phase). Survey firms go to 02 Survey, geotechnical to 01 Design, environmental to 03 Environmental. In the data: Northwest Survey Partners and Summit Utility Locating go to 02 Survey, Cascade Geotechnical to 01 Design, Riverbend Environmental to 03 Environmental. Some cases (11-15%) differ and the team has not saTeam, confirmed by data
Approval routeThe project manager always approves. If the invoice is over $50,000, the principal also approves. Otherwise PM only.The team
Whether the invoice can be enteredNever enter more than the remaining subcontract authorization; check the not-to-exceed amount first. If over, send it back to the subconsultant. The team gives different reasons when an invoice cannot be entered: contract or budget mismatch (40%), missing approval (40%), missing project or phase information (20%).The team
Whether to proceed when expense backup is missingNot known yet: ask the team. Answers only say backup is evidently needed before entry.Not known yet
Whether an invoice needs Project Review in VantagepointNot known yet: ask the teamNot known yet
Who receives the Outlook message and what it saysNot known yet: ask the team. The team says it is sent to the approvers after entry but gives no required wording.Not known yet
Whether to approve the prepared voucherThe coordinator approves each prepared voucher (policy: no unattended changes to records or messages).Team, confirmed by data

Where a person signs off

Exceptions

WhenWhat the agent does
Invoice is over the remaining subcontract authorization (part of the unusual invoices, which about 43% of the team say come up often)Do not enter. Prepare a draft reply to the subconsultant with the figures. The coordinator reviews and sends it.
Expense backup is missing (same overall frequency as above)Hold the voucher and tell the coordinator what is missing. The team has not said who is contacted, so a person decides.
Phase on the subcontract differs from the vendor's usual phase (about 11-15% of cases)Use the subcontract phase but flag the difference to the coordinator in the approval card.
Charge would go to a closed phase (a known pain point)Do not prepare the voucher. Send to the coordinator with the phase status.
Vendor or subcontract cannot be matched, or PDF extraction is low-confidence (scans, odd layouts)Hand to the coordinator with the invoice and what was extracted, for manual entry.
The invoice needs the Project Review step in Vantagepoint (about 29% of cases, about 14 extra minutes)Not known why. Until the team explains it, flag these cases to the coordinator rather than automating them.

Build with

Skills: Power Automate, Copilot Studio, Deltek Vantagepoint API, Document extraction and prompt design

Before building

Risks

How we'll know it worked

Still to answer before building

Where the team disagrees

Settle these first: an agent needs one rule, and new hires get mixed answers today.

Evidence

Observed main path (35% of cases): Microsoft Outlook → Subconsultant Invoice.pdf (Adobe Acrobat) → Voucher Entry · Accounts Payable (Deltek Vantagepoint) → Edit Vendor → Edit Phase → Edit Approval route → Microsoft Outlook → Edit Message body

Handover spec for the builder (text) →

Designed by AI from how the team did this work (2026-10-19 to 2026-10-23), the company's tools and its rules. A starting point for the builder: confirm system access and approvals before building.